Parameter attribute
①Model: LMBM-03
②Suitable for various specifications of square cells
③Compatible cell size: Width 120~380mm, height 75~240mm, thickness 15~90mm.
④Cycle time: ≥3PPM.
⑤First time yield: ≥99.5% (number of defective produtcs / number of all products).
⑥Failure rate: ≤2%
⑦Equipment size: About 2800*1550*2350mm (L*W*H)
⑧Equipment weight: About 3T
⑨Rated power: 6KW
⑩Power supply: AC380V
⑪Air pressure: 0.6 Mpa, the outer diameter of the intake pipe is 12mm.
⑫Air consumption: 0.3L/min (atmospheric dew point≤-30℃, maximum particle diameter≤1μm, maximum particle concentration<1mg/m³, oil content≤5mg/m³)
⑬Control system: PLC
Advantages
①The cyble length is adjustable, and different positions can be selected for manual loading, which is suitable for different production modes.
②Compatible with a variety of battery cell models, convenient for replacement.
③Compatible with U-shaped and ring-shaped filing methods.
④The blue film is stable and reliable, and it's subject to full-closed loop control of tension controller.
⑤The filming process is automatically corrected.
Benefits
①Convenient for operation
(1) The feeding conveyor belt and the unloading platform are on the same side of the equipment to minimize personnel movement.
(2) The start button is close to the feeding position for easy operation.
(3) Both sides of the equipment are provided with emergency stop buttons.
②Two different filming modes: Choose U-shaped filming or ring-shaped filming depending on the electrode position on the cell. The size of the edge-sealing film is changeable, and the film and the battery are fit closely, which is free of bubbles and bulges.
③The filming data is bound to the battery QR code and uploaded to the MES system. The equipment is switchable between manual/automatic working mode. The equipment is featured with automatic process control, historical data query and export, real-time display of key parameters, alarm and traceability, and safety protection.
④The equipment is featured with automatic code scanning, cell static electricity and dust removal, cell automatic flipping, cell automatic handling, blue film deviation correction, automatic balance of tension, traceable data, and manual loading and unloading, etc.
Lead time
①90 days after advance payment